Analisis pengendalian persediaan bahan baku yang efektif guna memperlancar proses produksi PT Chiyoda Industry Indonesia

Putri, Misti Dewi (2022) Analisis pengendalian persediaan bahan baku yang efektif guna memperlancar proses produksi PT Chiyoda Industry Indonesia. Sarjana (S1) thesis, Universitas Islam "45" Bekasi.

[thumbnail of PENDAHULUAN.pdf] Text
PENDAHULUAN.pdf

Download (3MB)
[thumbnail of BAB I MISTI D.pdf] Text
BAB I MISTI D.pdf

Download (153kB)
[thumbnail of BAB II MISTI D.pdf] Text
BAB II MISTI D.pdf
Restricted to Repository staff only

Download (457kB) | Request a copy
[thumbnail of BAB III MISTI D.pdf] Text
BAB III MISTI D.pdf
Restricted to Repository staff only

Download (270kB) | Request a copy
[thumbnail of BAB IV MISTI D.pdf] Text
BAB IV MISTI D.pdf
Restricted to Repository staff only

Download (816kB) | Request a copy
[thumbnail of BAB V MISTI D.pdf] Text
BAB V MISTI D.pdf

Download (13kB)
[thumbnail of DAFTAR PUSTAKA MISTI D.pdf] Text
DAFTAR PUSTAKA MISTI D.pdf

Download (128kB)

Abstract

ABSTRACT
This study aims to determine and analyze the inventory of raw materials, determine the optimal
amount of inventory, and determine the cost efficiency of raw material inventory used by
researchers at company PT Chiyoda Industry Indonesia. Theresults of the research used are the
number of purchases of raw materials according to the company with the JIT method of 35.915
pcs. The EOQ method of purchasting raw materials in one order 50.890 pcs. The frequenoy of
purchases made by the company’s JIT method is 12 times while the EOQ method is once a year.
The cost of ordering according to the company’s JIT method policy is Rp2.635.350,00 while the
EOQ method is Rp7.320.00,00. There is No. storage cost in the company’s JITmentod while the
EOQ method is Rp70.215.692,00 the total cost of inventory for the company’s JIT method is not
avatlable, while the EOQ method is Rp77.536.692,00 the total cost for the company’s JIT
method is Rp2.635.350,00 while the EOQ method is Rp155.073.384,00 and with an overall
average of Rp51.691.128,00
Keywords: Inventory control, raw materials, method JIT, and Method EOQ

Item Type: Thesis (TA, Skripsi, Tesis, Disertasi) (Sarjana (S1))
Contributors/Dosen Pembimbing,NIDN Dosen bisa diakses di LINK https://bit.ly/NIDNdosenunismabekasi:
Contribution
Contributors / Dosen Pembimbing
NIDN
UNSPECIFIED
Berry, Yunike
0408128901
Keywords / Kata Kunci: Inventory control, raw materials, method JIT, and Method EOQ
Subjects: Manajemen Operasional
Manufaktur
Faculty: Fakultas Ekonomi > Manajemen S1
Depositing User: Mis Misti Putri
Date Deposited: 16 Sep 2022 06:39
Last Modified: 16 Sep 2022 06:39
URI: http://repository.umindonesia.ac.id/id/eprint/1188

Actions (login required)

View Item View Item