PERHITUNGAN BAR BENDING SCHEDULE PADA PROYEK PEMBANGUNAN GROUNDSILL GS5 CIPAMINGKIS DENGAN BIM TEKLA STRUCTURES

Hyogatama, Iqbal Halilintar (2026) PERHITUNGAN BAR BENDING SCHEDULE PADA PROYEK PEMBANGUNAN GROUNDSILL GS5 CIPAMINGKIS DENGAN BIM TEKLA STRUCTURES. Sarjana (S1) thesis, Universitas Muhammadiyah Indonesia.

[thumbnail of PENDAHULUAN_compressed.pdf] Text
PENDAHULUAN_compressed.pdf

Download (567kB)
[thumbnail of BAB I.pdf] Text
BAB I.pdf
Restricted to Repository staff only

Download (149kB) | Request a copy
[thumbnail of BAB II.pdf] Text
BAB II.pdf
Restricted to Repository staff only

Download (441kB) | Request a copy
[thumbnail of BAB III.pdf] Text
BAB III.pdf
Restricted to Repository staff only

Download (668kB) | Request a copy
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Repository staff only

Download (692kB) | Request a copy
[thumbnail of BAB V.pdf] Text
BAB V.pdf
Restricted to Repository staff only

Download (129kB) | Request a copy
[thumbnail of DAFTAR PUSTAKA.pdf] Text
DAFTAR PUSTAKA.pdf

Download (85kB)

Abstract

ABSTRACT

Water resources infrastructure development, such as Groundsills, requires retaining wall structures that predominantly rely on steel reinforcement. On-site rebar management frequently encounters volume deviations and high material waste due to the imprecision of conventional spreadsheet-based Bar Bending Schedule (BBS) calculations, particularly in tapered geometric structures. This study aims to analyze the comparison of rebar volume and material waste between conventional calculation methods and Building Information Modeling (BIM) using Tekla Structures software, identify the technical factors causing these deviations, and calculate the resulting cost savings. This quantitative descriptive research employs a case study approach on the segment GS5 retaining wall structure in the Cipamingkis Groundsill Construction Project across a 10-meter span. The analysis results indicate that the implementation of 3D parametric modeling using BIM Tekla Structures is proven to be more efficient in estimating rebar volume requirements and reducing material waste percentages compared to conventional methods. The volume deviations are caused by the limitations of manual methods in accurately calculating inclined sections, the neglect of rebar elongation factors during bending, and the determination of development lengths (lap length and hook) that frequently exceed the SNI 2847:2019 standard reference. The optimization of cutting plans and the accuracy of BIM-based quantity takeoff provide significant material cost savings based on the Unit Price Analysis (AHSP) standards of Bogor Regency.

Keywords: Bar Bending Schedule, Building Information Modeling, Groundsill.

Item Type: Thesis (TA, Skripsi, Tesis, Disertasi) (Sarjana (S1))
Contributors/Dosen Pembimbing,NIDN Dosen bisa diakses di LINK https://bit.ly/NIDNdosenunismabekasi:
Contribution
Contributors / Dosen Pembimbing
NIDN
UNSPECIFIED
Darma, Eko
0422017203
UNSPECIFIED
Paryati, Ninik
0429017903
Keywords / Kata Kunci: Bar Bending Schedule, Building Information Modeling, Groundsill.
Subjects: Manajemen Konstruksi
Faculty: Fakultas Teknik > Teknik Sipil S1
Depositing User: Mr. Iqbal Halilintar
Date Deposited: 14 Aug 2026 04:33
Last Modified: 14 Aug 2026 04:33
URI: http://repository.umindonesia.ac.id/id/eprint/10513

Actions (login required)

View Item View Item