ANALISIS PENGUKURAN KERJA DALAM MENENTUKAN WAKTU STANDAR DENGAN METODE TIME STUDY GUNA MENINGKATKAN PRODUKTIVITAS KERJA PADA CV MELKO ENGINEERING

Wulandari, Dian Aryani (2025) ANALISIS PENGUKURAN KERJA DALAM MENENTUKAN WAKTU STANDAR DENGAN METODE TIME STUDY GUNA MENINGKATKAN PRODUKTIVITAS KERJA PADA CV MELKO ENGINEERING. Sarjana (S1) thesis, Universitas Islam 45 Bekasi.

[thumbnail of PENDAHULUAN.pdf] Text
PENDAHULUAN.pdf

Download (667kB)
[thumbnail of BAB I.pdf] Text
BAB I.pdf

Download (223kB)
[thumbnail of BAB II.pdf] Text
BAB II.pdf
Restricted to Repository staff only

Download (425kB) | Request a copy
[thumbnail of BAB III.pdf] Text
BAB III.pdf
Restricted to Repository staff only

Download (392kB) | Request a copy
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Repository staff only

Download (384kB) | Request a copy
[thumbnail of BAB V.pdf] Text
BAB V.pdf

Download (89kB)
[thumbnail of DAFTAR PUSTAKA.pdf] Text
DAFTAR PUSTAKA.pdf

Download (189kB)

Abstract

The purpose of this research is to find out the use of the time study method in work measurement, to find out what factors are used in the measurement of standard work time, and to determine the amount of standard time. The data collection method used in this research is primary data obtained directly from the measurements conducted. Meanwhile, the data analysis method uses the time study method.

Research results: there is a discrepancy between theory and the phenomenon that occurs in the company, namely that there are several workers who use idle time and personal time more than the time set by the company, which is 12.5%, due to poor supervision and lack of work time discipline. The factors used in work measurement include the performance rating and the allowance. The result of the standard time calculation for producing the Blade Holder is 8,550.40 seconds or 142.50 minutes or 2.37 hours. The standard time per work element for the milling 1 process is 4,001.79 seconds, brushing is 446.43 seconds, milling 2 is 1,128.77 seconds, grinding is 508.01 seconds, milling 3 is 1,796.19 seconds, tapping is 257 seconds, and finally QC is 397.57 seconds.

Item Type: Thesis (TA, Skripsi, Tesis, Disertasi) (Sarjana (S1))
Contributors/Dosen Pembimbing,NIDN Dosen bisa diakses di LINK https://bit.ly/NIDNdosenunismabekasi:
Contribution
Contributors / Dosen Pembimbing
NIDN
UNSPECIFIED
Juliandara, Luthpiyah
0415079402
Keywords / Kata Kunci: Pengukuran Kerja, Waktu Standar, Studi Waktu, Kelonggaran.
Subjects: Manajemen Operasional
Manufaktur
Faculty: Fakultas Ekonomi > Manajemen S1
Depositing User: Ms Dian Aryani
Date Deposited: 04 Jul 2025 09:01
Last Modified: 04 Jul 2025 09:01
URI: http://repository.umindonesia.ac.id/id/eprint/7865

Actions (login required)

View Item View Item